Data Collection,
Analysis and Reporting
Determining
what information to collect
Deciding what data to
collect will depend on the phase of the projectthe conceptual, design,
production, or maintenance phase. In any case, data should include failures
due to equipment failure and human error. The conceptual phase will require
the use of data from similar products. The design phase will require research
or actual test data for the specific product. The production phase requires
the use of a more historical type data derived sometimes from the design
stages. The maintenance phase requires the use of actual failure data
that may have been acquired with various failure analysis techniques.
In short, all failures must be included from development to acceptance.
Five basic steps are outlined
below that will help determine what data to collect:
-
Find out what happened,
and be as specific as possible. At what level in the overall system,
product, or process was the event discovered?
-
Method of detection.
Internally? Externally?
-
Find out when the
event happened. During testing? During production run?
-
Find out if there
is a similar event in historical records. If the answer is "yes,"
it could save time by eliminating some data collection.
-
Find out if there
have been any recent changes. Check vendor materials, test conditions,
etc.
How will
data be collected and reported
Data may be collected
by either manual or automatic means. Most test results or observations
are recorded manually on forms customized to collect specific information
then input into a computer database. Data is sometimes taken automatically
through the use of electronic devices that send information directly to
a database.
The automatic data information
gathering technique is usually desirable where continuous monitoring is
necessary.
There are no standards
for how to record or store data. When data is input into a computer, manually
or automatically, both retrieval and use become obviously enhanced. There
are many software packages on the market that can be readily tailored
to fit specific needs.
Who will
collect the information
Deciding who will collect
the information depends on who will use the data, the accuracy needed,
and time and cost constraints. Keep in mind that the person who collects
data is not necessarily the one who will use it.
What level
of accuracy is needed
Accuracy will depend on
the product and its intended use. For example, a cook may only need to
take time and temperature data at ± minutes and degrees, while
a race car designer may want time and temperature in ± tenths of
seconds and degrees. For another example, if someone is asked their age
10 days before their 40th birthday, they may reply 39 or 40. Which is
more accurate? Which is accurate enough? It could be important enough
to require an answer like: 39 years, 355 days, 12 hours, and 15 minutes.
Of course, asking a persons age usually will not require that much
detail, but when asking how long a verified equipment problem has persisted,
details do become important.
The program outlined below
will help assure that accurate and complete data is collected which meets
the objectives for data collectingidentifying, reporting, verifying,
analyzing, and correcting problems.
-
Identify and
control failed items.
A tag should be affixed
to the failed item immediately upon the detection of any failure or
suspected failure. The failure tag should provide space for the failure
report serial number and for other pertinent entries from the item
failure record. All failed parts should be marked conspicuously and
controlled to ensure disposal in accordance with all laws, rules or
regulations. Failed parts should not be handled in any manner that
may obliterate facts which might be pertinent to the analysis and
stored pending disposition of the failure analysis agent.
-
Reporting
of problems or failures.
A failure report should
be initiated at the occurrence of each problem or failure of hardware,
software, or equipment. The report should contain the information
required to permit determination of the origin and correction of failures.
The following information should be included in the report:
-
Descriptions of
failure symptoms, conditions surrounding the failure, failed hardware
identification, and operating time (or cycles) at time of failure
-
Information on
each independent and dependent failure and the extent of confirmation
of the failure symptoms, the identification of failure modes,
and a description of all repair action taken to return the item
to operational readiness
-
Information describing
the results of the investigation, the analysis of all part failures,
an analysis of the item design, and the corrective-action taken
to prevent failure recurrence (if no corrective-action is taken,
the rationale for this decision should be recorded)
-
Verify failures.
Reported failures
should be verified as actual failures or an acceptable explanation
provided for lack of failure verification. Failure verification is
determined either by repeating the failure mode on the reported item
or by physical or electrical evidence of failure (leakage residue,
damaged hardware, etc.) Lack of failure verification, by itself, is
not sufficient rationale to conclude the absence of a failure.
-
Investigation
and analysis of problems or failures.
An investigation and
analysis of each reported failure should be performed. Investigation
and analysis should be conducted to the level of hardware or software
necessary to identify causes, mechanisms, and potential effects of
the failure. Any applicable method (test, microscopic analysis, applications
study, dissection, x-ray analysis, spectrographic analysis, etc.)
of investigation and analysis that may be needed to determine failure
cause shall be used. When the removed item is not defective or the
cause of failure is external to the item, the analysis should be extended
to include the circuit, higher hardware assembly, test procedures,
and subsystem if necessary. Investigation and analysis of supplier
failures should be limited to verifying that the supplier failure
was not the result of the suppliers hardware, software, or procedures.
This determination should be documented for notification of the procuring
activities.
-
Corrective-action
and follow-up.
When the cause of
a failure has been determined, a corrective-action shall be developed
to eliminate or reduce the recurrence of the failure. The procuring
activity should review the corrective-actions at scheduled status
reviews prior to implementation. In all cases, the failure analysis
and the resulting corrective-actions should be documented. The effectiveness
of the corrective-action should be demonstrated by restarting the
test at the beginning of the cycle in which the original failure occurred.
Who will
use the information
Deciding who will use
the data is probably of less concern than what data to use. Usually everyone
involved in the project will use some portion of the information. Assuring
that collected information is available to all as needed, and making it
easily accessible, is the key.
|